Completed Projects

Completed Projects

State-of-the-art solutions for water and sewer system and pipeline construction projects of all kinds.

For decades, RAMSCO has been a leader in private industry and municipal projects of all kinds and sizes: Sewer and drainage systems, water supply, airport construction, roadway repair, erosion control, and much more.

Curtis R. Priem Experimental Media and Performing Arts Center (EMPAC)

Owner: R.P.I. 
Contractor: William J Keller & Sons
Site:
Troy, NY

Curtis R. Priem Experimental Media and Performing Arts Center (EMPAC)

Project Objectives:

EMPAC’s 220,000 square-foot center is a signature work of architecture that brings together four main venues as well as many smaller studios and lab spaces under one roof. All can be used independently and simultaneously, allowing EMPAC to present events, host student gatherings, and dedicate space to research and residencies – all at one time. EMPAC includes many firsts and exceptional attributes in the fields of acoustics, structural integrity, theatrical presentation, and digital media. High-bandwidth computer, audio and video networks create a technical infrastructure unlike any other performing arts centers. And, when linked to Rensselaer’s CCNI supercomputer, EMPAC’s superb venues provide opportunities for research that surpass those of most other media research centers.

Scope of Work:

  • Infrastructure development

ECAV – East Campus Athletic Village

Owner: R.P.I.
Contractor:
 William J Keller & Sons
Site: Troy, NY

ECAV – East Campus Athletic Village

Project Objectives:

ECAV, as the new $92 million complex is known, is the latest in a decade-long physical transformation of Rensselaer. The project involves two phases. The grand opening signifies the end of Phase 1, which includes a multipurpose lighted stadium with field turf and seating for 5,200 and a 1,200 seat basketball arena. Also, fully equipped 4,800 square foot strength and conditioning center connects to a professional-caliber sports medicine suite, and within the arena are offices for athletics administrators and coaches, numerous meeting spaces, a new Athletics Hall of Fame, a pro shop and a café. Renovations to the Houston Field House were also made. Phase 2 will feature an indoor pool, outdoor tennis courts, and an indoor sports facility complete with a track and tennis courts. The time frame for Phase 2 is still being developed.

Scope of Work:

  • Infrastructure development

Page 1 of 4 pages  1 2 3 >  Last »